2 Year Warranty on ALL products

Ultimate Step-by-Step Wiring Guide for the S7-1500 and ET 200MP Modules

The Siemens S7-1500 and ET 200MP modules are a benchmark for industrial automation, delivering precision and efficiency. This optimized guide ensures flawless wiring, enabling your system to perform at its best. Follow these steps meticulously for a perfect setup.  Preparation and Safety Before starting, ensure all power sources are disconnected. Use a multimeter to confirm there is no live current. Prepare tools including a Phillips screwdriver (3–3.5 mm tip) and cable ties. Recommended wiring includes solid wires up to 2.5 mm² and stranded wires from 0.25 to 2.5 mm² (with ferrules). Ensure your workspace is clean and organized to avoid mishaps.  Step 1: Connecting the Load Current Supply (PM) to the CPU Detach the load current supply’s connector cover and connect the mains cable based on the voltage diagram. Secure the connector plug into the PM, then connect the PM to the CPU using a 4-pin connector plug. Tighten all screws securely. The CPU is now powered and ready for further connections.  Step 2: Wiring the Digital Input Module Insert the module’s front connector in the pre-wiring position. Attach a cable tie to secure the wire harness for strain relief. Connect the supply voltage (24 V DC) to terminals 19 (L+) and 20 (M). Use potential circuit bridges to unify potentials across the module. Push the front connector into its final position to establish the electrical connection.  Step 3: Wiring the Digital Output Module Begin by placing the front connector into the pre-wiring position. Connect terminals 39 (L+) and 40 (M) from the digital input module to terminals 19 (L+) and 20 (M) of the digital output module. Insert four potential bridges to ensure uniform distribution. Tighten the screws to finalize the connection.  Step 4: Configuring the ET 200MP Input and Output Modules For the input module, identify and select the DI 16x24VDC HF (e.g., 6ES7521-1BH50-0AA0) from the hardware catalog. Follow the diagram to connect the input channels, ensuring proper voltage alignment. For the output module (e.g., 6ES7522-1BH01-0AB0), connect the load devices to the respective channels. Verify that all connections are compliant with load and voltage specifications. Use potential bridges as needed for consistency.  Step 5: Ensuring Connection Integrity Thoroughly inspect all connections for accuracy. Use cable ties to secure wires and prevent strain on connectors. Test for continuity and voltage consistency with a multimeter. Correct any discrepancies before proceeding to power on.  Step 6: Initializing the System Insert a blank SIMATIC memory card into the CPU’s slot. Power up the CPU by switching the PM to "RUN." Access the CPU’s settings via the display panel, navigate to Settings > Addresses > X1 (IE/PN), and assign an IP address (e.g., 192.168.0.10) with subnet mask 255.255.255.0. Save and apply these settings.  Pro Tips for Mastery Use pre-wired connectors for faster installations and easier maintenance. Label all wires and connectors clearly for efficient troubleshooting and future upgrades. Monitor potential group loads to prevent circuit overloads and system inefficiencies.  By following these optimized steps, you will achieve a flawless wiring setup for your S7-1500 and ET 200MP modules, ensuring reliable and high-performing automation. For detailed technical references or advanced customization, consult Siemens’ official manuals or engage certified professionals.



The Siemens S7-1500 and ET 200MP modules are a benchmark for industrial automation, delivering precision and efficiency. This optimized guide ensures flawless wiring, enabling your system to perform at its best. Follow these steps meticulously for a perfect setup.

Preparation and Safety

Before starting, ensure all power sources are disconnected. Use a multimeter to confirm there is no live current. Prepare tools including a Phillips screwdriver (3–3.5 mm tip) and cable ties. Recommended wiring includes solid wires up to 2.5 mm² and stranded wires from 0.25 to 2.5 mm² (with ferrules). Ensure your workspace is clean and organized to avoid mishaps.

Step 1: Connecting the Load Current Supply (PM) to the CPU

Detach the load current supply’s connector cover and connect the mains cable based on the voltage diagram. Secure the connector plug into the PM, then connect the PM to the CPU using a 4-pin connector plug. Tighten all screws securely. The CPU is now powered and ready for further connections.

Step 2: Wiring the Digital Input Module

Insert the module’s front connector in the pre-wiring position. Attach a cable tie to secure the wire harness for strain relief. Connect the supply voltage (24 V DC) to terminals 19 (L+) and 20 (M). Use potential circuit bridges to unify potentials across the module. Push the front connector into its final position to establish the electrical connection.

Step 3: Wiring the Digital Output Module

Begin by placing the front connector into the pre-wiring position. Connect terminals 39 (L+) and 40 (M) from the digital input module to terminals 19 (L+) and 20 (M) of the digital output module. Insert four potential bridges to ensure uniform distribution. Tighten the screws to finalize the connection.

Step 4: Configuring the ET 200MP Input and Output Modules

For the input module, identify and select the DI 16x24VDC HF (e.g., 6ES7521-1BH50-0AA0) from the hardware catalog. Follow the diagram to connect the input channels, ensuring proper voltage alignment. For the output module (e.g., 6ES7522-1BH01-0AB0), connect the load devices to the respective channels. Verify that all connections are compliant with load and voltage specifications. Use potential bridges as needed for consistency.

Step 5: Ensuring Connection Integrity

Thoroughly inspect all connections for accuracy. Use cable ties to secure wires and prevent strain on connectors. Test for continuity and voltage consistency with a multimeter. Correct any discrepancies before proceeding to power on.

Step 6: Initializing the System

Insert a blank SIMATIC memory card into the CPU’s slot. Power up the CPU by switching the PM to "RUN." Access the CPU’s settings via the display panel, navigate to Settings > Addresses > X1 (IE/PN), and assign an IP address (e.g., 192.168.0.10) with subnet mask 255.255.255.0. Save and apply these settings.

Pro Tips for Mastery

Use pre-wired connectors for faster installations and easier maintenance. Label all wires and connectors clearly for efficient troubleshooting and future upgrades. Monitor potential group loads to prevent circuit overloads and system inefficiencies.

By following these optimized steps, you will achieve a flawless wiring setup for your S7-1500 and ET 200MP modules, ensuring reliable and high-performing automation. For detailed technical references or advanced customization, consult Siemens’ official manuals or engage certified professionals.

Leave a comment

Please note, comments must be approved before they are published